Mayor Vincent C. Gray

Search
DC.gov   Planning

 

accordian interface begins

About OP

In Your Neighborhood

Across the City

Historic Preservation

DC Data and Maps

  • Interactive maps and analysis for DC

    Online Mapping Tools

    Interactive maps and analysis for DC

  • Ready-made DC maps

    Map Library

    Ready-made DC maps

  • Population, housing and other Statistics

    DC Data

    Population, housing and other Statistics

OP-Logo

Office of Planning


Office Hours
Monday through Friday, 8:30 am to 5 pm except holidays

How to Reach Us
1100 4th Street, SW, Suite E650
Washington, DC 20024
planning@dc.gov

Phone: (202) 442-7600
Fax: (202) 442-7638
TTY: 311

FOIA Information
Agency Performance

Website: http://planning.dc.gov

Facebook  Twitter 


Harriet Tregoning
Director, Office of Planning

Ask the Agency

 
Text Size: A A A Print Friendly Print   Share Share  

Chinatown Design Review Procedures 


Chinatown Main Page

The Director of Planning is required to review projects that the Department of Consumer and Regulatory Affairs (DCRA) identified as located within Chinatown. Once an application is reviewed for completeness at DCRA, the Plan Review Coordinator will refer the project to the design review staff for Chinatown Design Review. The design review staff consults with the Chinatown Steering Committee.

Pursuant to Mayor’s Order No. 89-132, dated June 9, 1989, the Director of Planning shall review referred applications on the basis of the following:

  • Consistency of the proposed project with the District elements of the Comprehensive Plan for the National Capital and the Chinatown Design Guidelines Study Report;
  • Contribution of building design, including sign and awnings to the Chinese identity of Chinatown; and
  • Chinese character of public space improvements and the contribution of those improvements to increased pedestrian activity.

If your project is major new construction proposed for Chinatown, it is strongly recommended that the owner submit a Chinatown Design Review application and design documents directly to the Office of Planning during the early phases of design prior to submitting construction documents for the DCRA Permit application process. Considering this option will save time during the approval process.

Below are Related Documents are links to various documents that will assist you with understanding the Municipal Regulation and the Chinatown Design Review Application Process

 

 

Goals

The contribution of building design, including sign and awnings to the Chinese identity of Chinatown

 

Program at a Glance

Program Title: Chinatown Design Review Procedures
Office: Revitalization and Design
Type: Other